............................... Date: Mon, 22 Feb 1999 18:03:07 Who: David Shupe Subject: Major database change coming Original file: /home/tab/jc.t ............................... From listmaster Mon Feb 22 18:01 PST 1999 Received: from castor.ipac.caltech.edu (castor [134.4.10.10]) by chomsky.ipac.caltech.edu (8.8.5/8.6.4) with ESMTP id SAA28170; Mon, 22 Feb 1999 18:01:45 -0800 (PST) Received: from skycap.ipac.caltech.edu (skycap.ipac.caltech.edu [134.4.50.197]) by castor.ipac.caltech.edu (8.8.8/8.6.4) with SMTP id SAA25907; Mon, 22 Feb 1999 18:01:47 -0800 (PST) Message-Id: <3.0.1.32.19990222180307.00be9b44@chomsky.ipac.caltech.edu> X-Sender: shupe@chomsky.ipac.caltech.edu X-Mailer: Windows Eudora Pro Version 3.0.1 (32) Date: Mon, 22 Feb 1999 18:03:07 -0800 To: tim@ipac.caltech.edu, cjl@ipac.caltech.edu, perry@ipac.caltech.edu From: David Shupe Subject: Major database change coming Cc: wire@ipac.caltech.edu In-Reply-To: <199902230117.RAA17325@skyhawk.ipac.caltech.edu> Mime-Version: 1.0 Content-Type: text/plain; charset="us-ascii" Content-Length: 2795 Status: RO Everyone please take notice of the major database change that will be happening this week. See Tim's change request for the description. Dave At 05:17 PM 2/22/99 -0800, tim wrote: >Submitted by: Tim Conrow > >Tracking Number: 42 > >Date: Mon Feb 22 17:17:42 1999 > >o Software to Modify: Many SO and DA DB access programs > >o Description of Requested Change: >1) Create new databases in DBMS; 'wire_debug', 'wire_dev', and possibly others >2a) Rename DB 'wire' to 'wire_test' and create a new DB called 'wire'. >2b) Re-create all table structures in 'wire_test' in 'wire', but without data (i.e. empty tables). >3) Alter DA programs db_soda1, db_soda2, db_warehouse*, plus various state change codes > to allow for user entry of DB name to use. Do not change SO codes requireed for timeline delivery. >4) Make same changes as 3 for SO codes needed for timeline delivery. >5) Change timeline delivery scripts so SEQ mode 1 (debug t/l delivery) uses table 'observation' in 'wire_debug' DB > instead of table 'observation_debug' in 'wire' DB. > > >o Criticality: Requirement > >o Classification: Major Change > >o How long will it take: 2 Day(s) > >o Risk Factor: Medium Risk > >o Comments on criticality, risk, etc.: >- 1-3) must be completed ASAP. Target Wed. (2-24-99), but > Thurs. AM is acceptable. >- 4) can be done post launch but should be done before > any changes are required to the SO timeline delivery > code. I.e. ASAP after launch. >- 5) can be done at any time and is of lower priority > >o Justification: >1-2 are required for flight observation data to >be recorded in a fresh data base, separate from ops >test data. 3) must be done so DA can test Input changes >on ops test data before launch. 4) must be done to >allow SO to test new code post launch. 5) is an >enahncement that will allow greater flexibility and >upgradability in the timeline delivery process. > >o Impact of change on SOC subsystems: >Increase in flexibility and seapration of ops test and real data. > >o Proposed testing procedure and tester(s): >1-3) Generate a set of timelines and subject them to > the usual validation procedures. >4) Regenerate a previous delivery in a new DB and > compare the new timelines and obs table to the > old one. >5) Same as 4. > > CCB Response Case Type: 1 Approved: approved Action Item Number(s): Unavailable Date reviewed by CCB: Mon Feb 22 17:57:06 1999 CCB assessment of criticality: This is a critical, major change that is required to allow database tools to be tested with ops test data without harming the mission database. CCB assessment of risk: medium risk. Procedure for passing to DEV or OPS: As specified in change request. Name of tester: Yi, Wen, Tim, Tom Test results due by: February 26, 1999